One of the activities has been the installation of the flooring. Saturday saw the stairs from the top floor down to the main floor get carpeted as well as the hardwood flooring (HWF) in the two upstairs bedrooms. By the end of this week we hope to have the sheet vinyl down in the kids bathroom, the sheet vinyl in the kitchen installed and the HWF extended from the original house through tpo the kitchen and family room. We also picked up the ceramic tiles this week so hopefully that will be installed as well.
Below are a series of images of the work completed to date.