Once we were satisfied with the Conceptual and Design drawings, the next step was to convert these drawings into working drawings for the City and Contractors. I always forget about how much detail is needed and the time alloted to do these.

Though the scale is somewhat small, hopefully it is identifiable enough. The drawing above is of the existing house and the extent of the demolition that is required.

This drawing shows just what we are doing, Basement and Main Level.

This is the new Second Level where the kids rooms will be. We have added a third Guest Bedroom with access to the roof top patio but I foresee this being a home gym instead. No worries for any out of town guets, we are adding close to 900sq ft overall so there should be room somewhere!!

Finally the final Exterior Elevations. This shows all four sides of the house and the impact that this will have.
No comments:
Post a Comment